The Gallery 2 - Past and Present Projects |
An unsightly and dangerous walkway between 2 buildings, converted to DDA compliant access ramps - pics with railings to follow soon.
New fence, posts and gate integrated with a new log store complete with tiled roof, guttering and lead flashing
DDA compliant handrails designed and fitted to disabled access ramps
Shower Room Renovation - Creation of storage space, battened walls and new floor
Construction complete, just needs a lick of paint...
Faux Shutters for a Park Home, using tongue and groove boards and a wedged backing rail to "tie" the open shutters to the walls
Concrete ramp with brick edging and galvanised hand rail added to some exisiting fanned steps to make access easier
Carpenter Bee damage to mortar joints - Repointed and bricks replaced
Render patching and Tyrolene finish
A well used outbuilding in need of well, virtually new everything! Including 2 feet of extra height - the green door was only 5 feet tall!
Another bathroom, stripped and ready to be updated. Walls boarded, tiled, new boxing in, new suite, and floor fixed and levelled for new lino
My own Log Store and Shed under construction
No "Before" pics, just a flat wall with a gas vent on it. Opened up the fireplace, rendered the walls and installed log burner, polished porcelain tiles and bespoke custom made fireplace surround
Complete Log Burner and Double Skin Flue, Cellar was built up to provide a stable base for the hearth and brickwork - finished with reclaimed bricks, oak beam and quarry tiles for a really authentic look in a period cottage.
All images and content 2010-2012 J Fretwell /John the Builder Web Design 2010-2012 J Fretwell /John the Builder
|